Published in November 2014
Consultants are often asked to prepare as-built drawings even though they were not necessarily on site at the time the relevant works were constructed; in the event that the drawings prove inaccurate, this can have significant implications. This LPA provides advice on how as-built drawings should be produced including using information from the Contractor on site.